Full Reno in Carter Crest

Below are the pictures prior to our arrival. Client chose to do some of the demolition work himself and had us finish up and prep everything for us to proceed. This bathroom went from a whirlpool jacuzzi tub on a deck/skirt to a free standing tub. The shower had a fibreglass base with tiled walls an the floors were linoleum material.

Our plumber moved the lines from the previous position of the jacuzzi to the new self standing tub location. He also installed the new Moen rough in for the shower. Our HVAC moved the heat run from where it was located to the new position. Lastly our electrician used the previously used wire run for the jacuzzi whirlpool to power the heated floors. We removed all the linoleum, prepared the substrate, screwed down all surfaces. The first thing to do after this is to build down the shower floor for a barrier-less shower. Please take a look at the pictures below to appreciate the work done in order to get that done.

We drywalled the walls. Installed kerdi waterproofing membrane.

Plumbing finishing stage and electrical and we have ourselves a new bathroom for Ken and family.