Full Reno Conversion in Carter Crest

This job was a beautiful full Reno Conversion into a self standing tub. Below are the pictures prior to our arrival. Client chose to do some of the demolition work himself and had us finish up and prep everything for us to proceed. This bathroom went from a whirlpool jacuzzi tub on a deck/skirt to a free standing tub. The shower had a fibreglass base with tiled walls an the floors were linoleum material.

Full Reno Conversion Pictures Before:

Our plumber moved the lines from the previous position of the jacuzzi to the new self standing tub location. He also installed the new Moen rough in for the shower. Our HVAC moved the heat run from where it was located to the new position. Lastly our electrician used the previously used wire run for the jacuzzi whirlpool to power the heated floors. We removed all the linoleum, prepared the substrate, screwed down all surfaces. The first thing to do after this is to build down the shower floor for a barrier-less shower. Please take a look at the pictures below to appreciate the work in order to get that done.

We drywalled the walls. Installed kerdi waterproofing membrane. We then installed ditra heat membrane on the floor area. Installed the coil, tested it, and did a scratch coat on top.

From the shower floor area to the bathroom floor area we did an overlap of the Kerdi waterproofing to protect the heated floor system from any wet areas.

We laid tile on all walls around the Self Standing Tub only. There are times where we get asked to do wall tile on the whole bathroom like this. Plumbing finishing stage and electrical and we have ourselves a new bathroom for Ken and family.

Here or some picture of the Full Reno Conversion Completed:

Full Reno Conversion Complete 1
Full Reno Conversion Complete 2
Full Reno Conversion Complete 3
Full Reno Conversion Complete 4
Full Reno Conversion Complete 5
Full Reno Conversion Complete 6

A lot of the items purchased for this project were from www.WayFair.com