In this new build we were required to install a fireplace, vanity splash, kitchen backsplash, as well as a main bathroom tub surround and floor. The fireplace was installed using ProLite LFT Mortar, and the 12×24 tile was set in a stacked pattern. The mosaic vanity splash and kitchen backsplash were installed using ReliaBond Tile Adhesive. The main bathroom 12×24 tile was installed in a random staggered pattern using VersaBond Mortar. All areas were then grouted using a high performance, stain resistant Prism Grout.