New Build in Beaumont

This is a new build in Beaumont. From this series of photos it’s easy to our step by step process in constructing a shower. We arrive to a bare area and begin by waterproofing the walls with Schluter Kerdi Membrane. We cover the walls with the Kerdi Membrane, construct a shower curb, and install the drain kit. After the Kerdi Membrane is on, we begin installation of the 12×12 wall tile. This builder had us install it in a straight lay pattern. Both the Kerdi Membrane and the tile were set using Premium Plus Mortar. When the shower was complete we began installation of the jacuzzi tub deck and skirt, and the bathroom floor. These areas of install were done in the same fashion as the shower, the only difference being that it was set using VersaBond Mortar. After a couple days once the mortar ad set we went back to complete the job using a high performance, stain resistant Prism Grout.

11138624_815867525167934_2154597206131355928_n

11021136_815867548501265_5479808545346777400_n

11138095_815867561834597_8177539608951199272_n17424_815867595167927_8917257527080624867_n

Leave a Reply

Your email address will not be published. Required fields are marked *