Renovation in Leduc

In this renovation job we were asked to set 12×24 tile in a 70/30 staggered pattern for both the floor and the tub. For the tub surround we installed a 4″ mosaic insert on the top of the jacuzzi splash, we well as on the 3″ mosaic insert on the tub skirt. The jacuzzi was set using VersaBond Thin-Set  and the floor was set using 253 Gold Laticrete Thin-Set. The bathroom was grouted using a high performance, stain resistant Prism Grout.

10592906_685814138173274_759148484164685783_n

10610655_685814191506602_7284703196512583524_n 1380558_685814164839938_2328664883665718758_n

Leave a Reply

Your email address will not be published. Required fields are marked *